Found an issue or have a suggestion? Email us at [email protected]. For the best experience, download the ShareHub app →
NEPSE
2636.75
- 10.89
0.41%
Sharehub Logo

Construction of 16.5 MW Sisuwakhola Hydropower Project in Sankhuwasabha Initiated with 51% Investment from Upper Hewa Khola Hydropower

Auto translated from Nepali

February 18, 2026 08:08 AM

Construction of 16.5 MW Sisuwakhola Hydropower Project in Sankhuwasabha Initiated with 51% Investment from Upper Hewa Khola Hydropowerसंखुवासभामा १६.५ मेगावाटको सिसुवाखोला जलविद्युत् आयोजना बन्ने, अपर हेवाखोला हाइड्रोपावरले ५१ प्रतिशत लगानी गर्दै
Mero Lagani

Mero Lagani

The construction of the 16.5 MW Sisuwakhola hydropower project in Sankhuwasabha is moving forward. The project, which will be located in Silichong Rur...

Auto translated from Nepali

Discussion

0

Want to join the discussion? Log in or sign up to write a comment.

Powered by Softshala NepalCharts powered by Trading View