Found an issue or have a suggestion? Email us at [email protected]. For the best experience, download the ShareHub app →
NEPSE
2635.49
- 12.16
0.45%
Sharehub Logo

Heavy Rains and Flood Disrupt Power Generation at Daramkhola Hydroelectric Project

Auto translated from English

September 29, 2026 05:42 AM

Heavy Rains and Flood Disrupt Power Generation at Daramkhola Hydroelectric Project3 Days Continues Heavy Rains and Flood Disrupt Power Generation at 9.6 MW Daramkhola Hydroelectric Project
Share Sansar

Share Sansar

Power generation at the 9.6 MW Daramkhola Hydroelectric Project has been halted due to flood damage to transmission infrastructure. The company report...

Auto translated from English

Discussion

0

Want to join the discussion? Log in or sign up to write a comment.

Powered by Softshala NepalCharts powered by Trading View