Found an issue or have a suggestion? Email us at [email protected]. For the best experience, download the ShareHub app →
NEPSE
2634.74
- 12.91
0.48%
Sharehub Logo

Post-Flood Situation of Mailung River Hydropower Project

Auto translated from Nepali

September 30, 2026 10:24 AM

Post-Flood Situation of Mailung River Hydropower Projectबाढीपछि मैलुङ खोलाको यस्तो छ अवस्था
Bajarko Chirfar

Bajarko Chirfar

The Mailung River Hydropower Project, with a capacity of 5 MW, has been completely shut down due to the devastating flood in Rasuwa. The flood on Bhot...

Auto translated from Nepali

Discussion

0

Want to join the discussion? Log in or sign up to write a comment.

Powered by Softshala NepalCharts powered by Trading View