Found an issue or have a suggestion? Email us at [email protected]. For the best experience, download the ShareHub app →
NEPSE
2636.75
- 10.89
0.41%
Sharehub Logo

Panchakanya Mai Hydropower Resumes Electricity Production After Repairs

Auto translated from Nepali

October 09, 2025 07:40 AM

Panchakanya Mai Hydropower Resumes Electricity Production After Repairsक्षतिग्रस्त पञ्चकन्या माई हाइड्रोपावरका आयोजनाबाट पुनः विद्युत उत्पादन सुरु
Artha Sansar

Artha Sansar

Panchakanya Mai Hydropower Limited has resumed electricity production from the Mai Si hydropower project after repairing damage caused by heavy rainfa...

Auto translated from Nepali

Discussion

0

Want to join the discussion? Log in or sign up to write a comment.

Powered by Softshala NepalCharts powered by Trading View