Found an issue or have a suggestion? Email us at [email protected]. For the best experience, download the ShareHub app →
NEPSE
2648.89
- 6.32
0.23%
Sharehub Logo

Rasuwagadhi Hydropower Hit Hard by Two Avalanches: Debt Burden at NPR 17.43 Billion, Q1 Loss of NPR 416.2 Million

Auto translated from Nepali

November 15, 2026 07:08 AM

Rasuwagadhi Hydropower Hit Hard by Two Avalanches: Debt Burden at NPR 17.43 Billion, Q1 Loss of NPR 416.2 Millionदुई हिमबाढीले थला पर्‍यो रसुवागढी हाइड्रोपावरः ऋणको भार १७.४३ अर्ब, पहिलो त्रैमासको नोक्सानी साढे ४१ करोड
Corporate Samachar

Corporate Samachar

The Rasuwagadhi Hydropower Project, with a capacity of 111 MW, has been completely damaged due to two devastating avalanches, severely impacting Rasuw...

Auto translated from Nepali

Discussion

0

Want to join the discussion? Log in or sign up to write a comment.

Powered by Softshala NepalCharts powered by Trading View