Suryakunda Hydro Electric Limited – First Quarter Analysis, FY 2083/84
Unaudited results as on Ashwin end 2083, compared with the same quarter last year (Ashwin end 2082) and with Ashad end 2083.

Summary
Suryakunda Hydro Electric, which runs the 11 MW Mathillo Tadi Khola project in Nuwakot, made a net loss of Rs 5.07 crore in the first quarter, against a profit of Rs 70.13 lakh a year ago. Quarter EPS is Rs -7.35.
The plant has not been able to send power since 11 Shrawan 2083, when a landslide damaged an NEA transmission tower; the 10 Bhadra Bhotekoshi flood then damaged NEA's Trishuli 3B hub substation, the project's evacuation point. Revenue fell 81.22% to Rs 1.33 crore, while depreciation (Rs 2.55 crore) and interest (Rs 2.98 crore) kept running. The company says NEA is rebuilding three 132 kV towers and one 220 kV tower.
| Indicator | Q1 2083/84 | Q1 2082/83 | Change |
| Revenue from operations | Rs 13,268,820 | Rs 70,655,234 | −81.22% |
| Cost of sales | Rs 6,223,105 | Rs 15,489,860 | −59.82% |
| Administrative expenses | Rs 2,446,680 | Rs 1,084,855 | +125.53% |
| Depreciation and amortisation | Rs 25,497,876 | Rs 22,242,524 | +14.64% |
| Profit/(loss) from operation | −Rs 20,898,842 | Rs 31,837,996 | Turned to loss |
| Finance cost | Rs 29,792,609 | Rs 24,681,682 | +20.71% |
| Net profit/(loss) | −Rs 50,691,451 | Rs 7,013,187 | Turned to loss |
| EPS (quarter) | -7.35 | 1.27 | – |
1. Where the profit came from

Compared with last year's Q1, lower revenue took away Rs 5.74 crore, higher finance cost Rs 51.11 lakh, higher depreciation Rs 32.55 lakh and higher administrative cost Rs 13.62 lakh. Lower cost of sales gave back Rs 92.67 lakh and there was no staff bonus (Rs 1.43 lakh).
2. Profit through the year

Based on Share Hub's records (Q1 082/83 from this report), single-quarter results in 2082/83 were a profit of Rs 70.13 lakh in Q1, then losses of Rs 48.49 lakh in Q2, Rs 2.48 crore in Q3 and Rs 1.06 crore in Q4. This report shows a smaller full-year loss for 2082/83 (Rs 2.17 crore, EPS -3.15) than Share Hub's Q4 record (Rs 3.32 crore), and higher Ashad equity (Rs 73.71 crore against 62.33 crore), so the year-end figures seem to have been revised.
3. Debt and balance sheet

| Particulars | Ashwin 2083 | Ashad 2083 | Change |
| Non-current borrowings | Rs 1,614,511,610 | Rs 1,627,276,424 | −0.78% |
| Current borrowings | Rs 138,311,780 | Rs 123,767,047 | +11.75% |
| Intangible (project) assets | Rs 2,345,783,002 | Rs 2,370,171,076 | −1.03% |
| Cash and cash equivalents | Rs 12,315,811 | Rs 6,865,979 | +79.37% |
| Total assets | Rs 2,516,705,000 | Rs 2,572,890,502 | −2.18% |
| Total equity | Rs 686,455,702 | Rs 737,147,153 | −6.88% |
Total borrowing is Rs 175.28 crore (Rs 161.45 crore long-term and Rs 13.83 crore current), 2.55 times equity, about the same as at Ashad end. Current liabilities of Rs 19.38 crore are well above current assets of Rs 12.34 crore (current ratio 0.64), so the company depends on its banks while the plant is down. Equity fell by the loss to Rs 68.65 crore and net worth per share dropped below face value to Rs 99.53.
4. Per-share figures and valuation
| Indicator | Value |
| EPS (quarter) | Rs -7.35 |
| EPS (annualised, derived) | Rs -29.40 |
| Net worth per share | Rs 99.53 |
| Market price (report) | Rs 738.90 |
| P/B | 7.42x |
| Current ratio | 0.64 |
At Rs 738.90 the share trades at 7.42 times net worth per share while the company is making losses, so there is no meaningful P/E. The price assumes a quick restart and normal generation after that.
Conclusion
Positives: a new plant (commercial operation from 12 Shrawan 2082), the damage is on NEA's side rather than the project itself, and NEA has started rebuilding the towers.
Watch: no generation until NEA restores the line and the Trishuli 3B substation, Rs 175 crore of debt with interest still running, a current ratio of 0.64, net worth below Rs 100, losses in every quarter since Q2 082/83, and a high P/B of 7.42x.
Suryakunda's results depend almost entirely on when NEA restores evacuation. Until then, each quarter will add a loss of several crore from depreciation and interest; check NEA's repair progress before relying on the current price.
Figures are from the company's unaudited Q1 report; quarter trends use Share Hub records. This is not investment advice.