Found an issue or have a suggestion? Email us at [email protected]. For the best experience, download the ShareHub app →
NEPSE
2623.56
+ 2.26
0.08%
Sharehub Logo

Mountain Energy Resumes Power Transmission from 42 MW Mistry Khola Project

Auto translated from Nepali

October 26, 2026 04:20 AM

Mountain Energy Resumes Power Transmission from 42 MW Mistry Khola Projectमाउन्टेन इनर्जीको ४२ मेगावाटको मिष्ट्री खोला आयोजनाबाट विद्युत् प्रसारण पुनः सुरु
Bajarko Chirfar

Bajarko Chirfar

Mountain Energy Nepal Limited has resumed power transmission from its 42 MW Mistry Khola Hydropower Project after repairing the damaged towers of the ...

Auto translated from Nepali

Discussion

0
Agree

Want to join the discussion? Log in or sign up to write a comment.

Powered by Softshala NepalCharts powered by Trading View